PSLV: The Story of ISRO's Workhorse

The Polar Satellite Launch Vehicle is a 44-metre, four-stage rocket that alternates solid and liquid stages. Since its first successful flight in 1994 it has launched Chandrayaan-1, Mangalyaan, Aditya-L1 and hundreds of foreign satellites — and earned the nickname "ISRO's workhorse".

PSLV has flown 64 times. These 20 flights are the ones that shaped it — debuts of each variant, records, failures and the fixes that followed.

20 milestones from 1993 to 2026: 15 successes, 4 failures, 1 partial successes and 0 other milestones.

PSLV specifications

  • Polar Satellite Launch Vehicle: 44 m tall, 2.8 m diameter, 320 tonnes at lift-off.
  • PS1 · S139 solid motor — HTPB solid (Up to six strap-on boosters)
  • PS2 · Vikas engine — UDMH / N₂O₄
  • PS3 · S7 solid motor — HTPB solid
  • PS4 · twin engines — MMH / MON (Restartable; reused as the POEM orbital platform)
  • Payload to Sun-synchronous (600 km): 1,750 kg
  • Payload to Sub-GTO: 1,425 kg
  • Record: 64 launches, 59 successes, 4 failures, 1 partial (92% success).
  • Variants: G (retired), CA (no strap-ons), DL (2), QL (4), XL (6 larger strap-ons)

2025–2026 · Two failures in a row

Two consecutive failures of the same solid third stage ended PSLV's reputation for near-perfect reliability. Until it flies again, the workhorse's future is under review.

PSLV-C62 · Same stage fails again

12 Jan 2026 · PSLV · Failure

Near the end of the third-stage burn, chamber pressure dropped again and the rocket veered off course, losing EOS-N1 and 15 co-passenger payloads. It was the first time PSLV had failed twice in a row.

PSLV-C61 · Third stage loses pressure

18 May 2025 · PSLV · Failure

A drop in chamber pressure in the solid third stage left the rocket short of orbit, and the EOS-09 radar satellite was lost. ISRO set up a failure-analysis committee.

2017–2024 · Records, a stumble and a platform

PSLV set a world record, suffered its first failure in 24 years, bounced back within five months and added two new variants. Its spent fourth stage became a small orbital laboratory.

PSLV-C60 · SpaDeX docking satellites

30 Dec 2024 · PSLV · Success

PSLV placed the two SpaDeX satellites in orbit for India's first docking experiment, and its fourth stage flew as POEM-4 with 24 more experiments on board.

SpaDeX story

PSLV-C57 · Aditya-L1

2 Sep 2023 · PSLV · Success

PSLV-XL launched India's first solar observatory into an elongated Earth orbit, from which Aditya-L1 climbed to the Sun–Earth L1 point, 1.5 million km away.

Full Aditya-L1 journey

PSLV-C53 · POEM orbital lab

30 Jun 2022 · PSLV · Success

After launching three Singaporean satellites, the fourth stage became POEM — the PSLV Orbital Experimental Module — actively stabilised and hosting six payloads, including two from Indian start-ups. Reusing the spent stage gives start-ups a cheap test-bed in orbit.

PSLV-C45 · QL variant debuts

1 Apr 2019 · PSLV · Success

The four-strap-on PSLV-QL launched the EMISAT electronic-intelligence satellite and 28 foreign satellites into three different orbits. The fourth stage, now fitted with solar panels, then hosted three experiments of its own.

PSLV-C44 · DL variant, fourth stage as a platform

24 Jan 2019 · PSLV · Success

The new PSLV-DL uses just two strap-ons. After deploying Microsat-R, the spent fourth stage was kept alive as an orbital platform carrying a student-built experiment, Kalamsat-V2.

PSLV-C40 · Back in under five months

12 Jan 2018 · PSLV · Success

PSLV returned to flight with Cartosat-2F and 30 co-passenger satellites — ISRO's 100th satellite among them — and released them across two orbits.

Comeback from PSLV-C39.

What went wrong: The heat shield did not separate and IRNSS-1H stayed trapped inside it.

Why: A fault in the fairing separation system meant the shield never opened.

What fixed it: The separation system was examined and checked again; PSLV-C40 flew successfully with 31 satellites.

PSLV-C39 · Heat shield stays shut

31 Aug 2017 · PSLV · Failure

The payload fairing did not separate, so the IRNSS-1H navigation satellite was trapped inside and the extra weight kept the stage from reaching its planned orbit. It ended a run of 39 consecutive PSLV successes.

PSLV-C37 · 104 satellites

15 Feb 2017 · PSLV · Success · World record

PSLV-XL deployed Cartosat-2D and 103 co-passenger satellites in one flight, timing each release so none collided. It held the record for most satellites on one launch until 2021.

In the ISRO timeline

2007–2016 · New variants, deep space

ISRO tailored PSLV to each mission: a lighter version without strap-ons for small payloads, and an extended version with longer boosters that could reach the Moon and Mars.

PSLV-C35 · Two orbits in one flight

26 Sep 2016 · PSLV · Success

Using the restartable fourth stage, PSLV placed SCATSAT-1 in an orbit of about 720 km, then fired again to release seven other satellites in a lower orbit — the first PSLV to deliver payloads into two different orbits.

PSLV-C29 · Fourth stage restarts in orbit

16 Dec 2015 · PSLV · Success

After delivering Singapore's TeLEOS-1 and five smaller satellites, PSLV's fourth stage was shut down and re-ignited — the first restart of the stage. Restarts let a single PSLV drop satellites into different orbits.

PSLV-C25 · Mangalyaan

5 Nov 2013 · PSLV · Success · Launched India's Mars mission

PSLV was not powerful enough to send a spacecraft straight to Mars, so it placed the Mars Orbiter Mission in a long elliptical Earth orbit and the spacecraft raised itself from there. The fourth stage coasted for a record 25 minutes before its final burn to reach the right point in orbit.

Mangalyaan story

PSLV-C11 · XL variant takes Chandrayaan-1 to the Moon

22 Oct 2008 · PSLV · Success · First PSLV-XL

The XL variant uses six longer strap-on boosters with 12 tonnes of propellant each. Its first flight sent Chandrayaan-1 on its way to the Moon, carrying India beyond Earth orbit for the first time.

Chandrayaan-1 story

PSLV-C8 · Core Alone variant debuts

23 Apr 2007 · PSLV · Success

The PSLV-CA ("core alone") flies without any strap-on boosters, making it cheaper for light payloads. Its first flight launched Italy's AGILE gamma-ray observatory — PSLV's first launch for a foreign customer as the main payload.

1993–2006 · Learning to fly

PSLV was designed to put India's remote-sensing satellites into sun-synchronous orbit without buying launches abroad. After a failed debut it settled into a run of successes and quietly opened a commercial business.

PSLV-C4 · First flight towards geosynchronous orbit

12 Sep 2002 · PSLV · Success

PSLV showed it could do more than polar orbits by placing the METSAT weather satellite, later renamed Kalpana-1, in a geosynchronous transfer orbit — a job normally meant for GSLV.

PSLV-C2 · First foreign satellites

26 May 1999 · PSLV · Success

Alongside Oceansat-1, PSLV carried South Korea's KITSAT-3 and Germany's DLR-Tubsat — the first time an Indian rocket launched satellites for another country, and the start of PSLV as a commercial launcher.

PSLV-C1 · First operational flight falls short

29 Sep 1997 · PSLV · Partial

The first operational PSLV put IRS-1D into a lower orbit than planned after a shortfall in the final stage. The satellite used its own thrusters to reach a usable orbit and went on to work for years. It is the only partial failure in PSLV's record.

PSLV-D2 · First success

15 Oct 1994 · PSLV · Success

The second developmental flight placed IRS-P2 in sun-synchronous orbit and proved the four-stage design: a solid first stage with six strap-ons, the liquid Vikas-powered second stage, a solid third stage and a small liquid fourth stage.

Comeback from PSLV-D1.

What went wrong: The first PSLV lost attitude control at stage separation and crashed into the sea.

Why: An error in the guidance software's control logic.

What fixed it: The software was corrected and tested far more extensively in simulation; PSLV-D2 reached orbit.

PSLV-D1 · Debut failure

20 Sep 1993 · PSLV · Failure

The first PSLV flew normally until second-stage separation, when an error in the guidance software caused an attitude problem. The rocket and IRS-1E fell into the Bay of Bengal.

In the ISRO timeline

Key facts for exams

  • PSLV = Polar Satellite Launch Vehicle. Four stages: solid (PS1), liquid (PS2, Vikas engine), solid (PS3), liquid (PS4).
  • Height 44 m, diameter 2.8 m, lift-off mass about 320 tonnes (XL variant).
  • Capacity: 1,750 kg to a 600 km sun-synchronous orbit; 1,425 kg to sub-GTO (ISRO figures).
  • Variants: CA (no strap-ons), DL (2), QL (4), XL (6 extended strap-ons). The original PSLV-G retired in 2016.
  • First flight PSLV-D1 (20 September 1993) failed; first success PSLV-D2 (15 October 1994).
  • First PSLV-XL: PSLV-C11 with Chandrayaan-1 (22 October 2008).
  • PSLV-C37 (15 February 2017) launched 104 satellites — a world record until 2021.
  • POEM (PSLV Orbital Experimental Module) reuses the spent fourth stage as an orbital platform.
  • Record as of January 2026: 64 launches, 59 successes, 4 failures, 1 partial failure.

Words used on this page

Burn
Firing a rocket or spacecraft engine for a set time to change its speed — and therefore its orbit. Speeding up raises the orbit; slowing down lowers it.
Docking
Two spacecraft meeting in orbit and locking together. It is needed to build space stations, refuel spacecraft and bring samples back from the Moon.
Geosynchronous transfer orbit (GTO)
A long oval orbit, low at one end and about 36,000 km at the other. Rockets drop communication satellites here; the satellite then fires its own engine at the high point to circle at that height.
Lagrange point (L1)
A spot where the gravity of two large bodies balances for a small spacecraft. Sun–Earth L1 is 1.5 million km from Earth towards the Sun, with a non-stop view of the Sun.
Payload
Whatever a rocket carries — satellites, a spacecraft, experiments. On a spacecraft, "payloads" are its science instruments.
Payload fairing
The nose cone that protects the satellite from air friction during the climb through the atmosphere, then splits open and falls away once the rocket is high enough.
Propellant (solid and liquid)
What a rocket burns: a fuel plus an oxidiser that supplies the oxygen. Solid propellant is a rubbery block cast inside the motor and can't be switched off; liquid propellant is pumped from tanks and can be throttled or restarted.
Rocket stage
A section of a rocket with its own engine and fuel. When its fuel runs out it drops away, so the rest of the rocket is lighter and can go faster. PSLV has four stages.
Strap-on booster
Extra rockets attached to the sides of a launcher to add thrust at lift-off. They fall away once empty. PSLV-XL has six; LVM3 has two very large ones.
Sun-synchronous orbit
A near-polar orbit timed so the satellite passes over any place at the same local time every day. Lighting stays consistent, which makes images easy to compare — so most imaging satellites use it.

Frequently asked questions

What is the full form of PSLV?

PSLV stands for Polar Satellite Launch Vehicle. It was designed to launch satellites into polar, sun-synchronous orbits, though it has also launched missions to the Moon, Mars and the Sun–Earth L1 point.

How many stages does PSLV have?

Four. The first and third stages burn solid propellant, and the second and fourth burn liquid propellant. Depending on the variant, up to six solid strap-on boosters are attached to the first stage.

Why is PSLV called ISRO's workhorse?

Because it has flown more missions than any other Indian rocket — 64 launches by January 2026 — and launched most of India's Earth-observation, navigation and science satellites, plus hundreds of foreign satellites.

Why did PSLV-C61 and PSLV-C62 fail?

Both flights lost chamber pressure in the solid third stage, which left the rocket without enough thrust to reach orbit. ISRO set up failure-analysis committees; the detailed findings had not been published as of late 2026.

Related: All ISRO Rockets, ISRO Missions Timeline, Next ISRO Launch, ISRO Satellite Tracker.