GSAT-19

GSAT-19 is an ISRO communication satellite that tested high-throughput Ka/Ku-band transponders and several new spacecraft technologies. It was the first satellite launched by the GSLV Mk III, on 5 June 2017.

What it does

GSAT-19 carries Ka/Ku-band high-throughput communication transponders.

It also carries GRASP, a Geostationary Radiation Spectrometer that studies charged particles in space and how radiation affects satellites and their electronics.

Spacecraft

The satellite weighed 3136 kg at launch and is built on ISRO's I-3K bus, with a mission life of 10 years.

It tested new technologies including a miniaturised heat pipe, a fibre-optic gyro, a MEMS accelerometer, a Ku-band telemetry and command transponder and an Indian-made lithium-ion battery.

Launch

GSLV Mk III-D1, the rocket's first developmental flight, lifted off from the Second Launch Pad at Sriharikota on 5 June 2017 and placed GSAT-19 in a geosynchronous transfer orbit.

The rocket has two S200 solid strap-on motors, an L110 liquid core stage and a C25 cryogenic upper stage.

Mission status

The public satellite catalogue carries GSAT-19 with an operational flag in geostationary orbit.

Sources

  1. GSAT-19 — satellite catalogue record (NORAD 42747) — CelesTrak
  2. GSAT-19 — ISRO
  3. GSLV Mk III-D1 / GSAT-19 Mission — ISRO
  4. GSat 19 — Gunter's Space Page