An Earth observation and X-ray astronomy satellite launched on the third PSLV development flight in March 1996, carrying an imaging spectrometer from Germany's DLR.
No longer operational, according to the public satellite catalogue.
IRS-P3 had three jobs: remote sensing of Earth's resources, X-ray astronomy, and regular calibration of the tracking radars used for PSLV launches. It carried:
IRS-P3 weighed 920 kg and had 817 watts of power. It was three-axis stabilised and based on the IRS-P2 design.
PSLV-D3 launched IRS-P3 from SHAR Centre, Sriharikota, on 21 March 1996. It flew a circular polar sun-synchronous orbit at 817 km, crossing the equator at 10:30 a.m.; WiFS covered the same ground every 5 days.
The mission ended in January 2006, after 9 years and 10 months.